This is a free house construction cost calculator built by Level Seven Architecture & Construction. Enter your floor sizes, rooms and finish level to see what a single storey house, duplex or triplex will cost to build in Bangladesh in 2026, with the rod, cement, bricks and labour it needs. It works for Dhaka, Chattogram, Bogura, Rajshahi, Rangpur, Mymensingh and other towns.
House Construction Cost in Bangladesh: How the Calculator Works
The calculator prices your house the way a builder does. It works out how much of every material and job the house needs, multiplies each by todayโs market rate, then adds site expenses, a contingency and the builderโs margin. You get the total, the cost per sqft, the list of materials and every rate, and you can change any rate to your own supplierโs price.
How to use the calculator, step by step
Choose single storey, duplex or triplex, and enter the area of each floor in sqft, including walls, stairs and verandahs.
Enter your bedrooms, bathrooms, kitchens and AC points.
Pick a finish level: standard, mid-range or premium. You can change any single finish afterwards.
Choose the foundation your soil test calls for, your location, and the wall and concrete options.
Read the total, then open the materials list, the cost table and โHow we worked it outโ.
Save the PDF, or send the estimate to us on WhatsApp for a firm quote.
The formula
Construction cost = materials + labour + fittings, + 3% site expenses, + 10% contingency, + 15% builderโs overhead and profit.
Cost per sqft = construction cost รท total floor area of all floors.
Quantities come from a typical RCC frame house: a column about every 13 ft, 10 ร 15 inch columns, 5 inch slabs, 10 inch outside walls and 5 inch inside walls. Your engineerโs drawings will change them a little.
Duplex construction cost per sqft in 2026 (3,000 sqft, Dhaka)
| Finish | You manage the build | Built by a contractor (turnkey) |
|---|---|---|
| Standard | เงณ2,900 per sqft | เงณ3,350 per sqft |
| Mid-range | เงณ3,200 per sqft | เงณ3,700 per sqft |
| Premium | เงณ3,800 per sqft | เงณ4,400 per sqft |
Both columns include 3% site expenses and a 10% contingency. Land, interiors, the boundary wall and design fees are extra.
Worked example 1: a 3,000 sqft mid-range duplex in Dhaka
Ground floor 1,500 sqft, first floor 1,400 sqft and a 100 sqft roof stair room; 4 bedrooms and 5 bathrooms; column footings on firm soil. Materials เงณ34.7 lakh + labour เงณ16.3 lakh + fittings เงณ33.9 lakh = เงณ84.9 lakh. Add 3% site expenses (เงณ2.5 lakh) and 10% contingency (เงณ8.7 lakh) for เงณ96.2 lakh if you manage the build yourself. Add 15% contractor overhead and profit (เงณ14.4 lakh) for เงณ1.11 crore turnkey, about เงณ3,690 per sqft.
Worked example 2: the same house as a triplex
Add a second 1,400 sqft upper floor, for 4,400 sqft in total. The footings grow from 5 ร 5 ft to 6 ร 6 ft and there is one more stair flight. The turnkey cost is about เงณ1.43 crore, or เงณ3,250 per sqft. The cost per sqft falls because more floors share the same foundation and roof.
Worked example 3: how many bricks does a duplex need?
Outside walls: 2,478 sqft ร 0.81 ft thick = 2,013 cft ร 12 bricks = 24,156 bricks. Inside walls: 3,293 sqft ร 5 bricks = 16,465 bricks. Roof parapet: 538 sqft ร 5 bricks = 2,688 bricks. Total: 43,309 bricks, about 14.4 for every sqft of floor.
How much rod, cement and bricks does a 3,000 sqft duplex need?
Rod: about 11.8 ton (3.9 kg per sqft)
Cement: about 1,273 bags (0.42 bags per sqft)
Bricks: about 43,300 for the walls, plus 7,400 picket bricks laid under the floor
Stone chips: about 2,940 cft; Sylhet sand 1,470 cft; local sand 2,750 cft
What changes the cost the most
| Change to a 3,000 sqft mid-range duplex | Effect on cost |
|---|---|
| Bored piles, 45 ft, on filled land | +เงณ20 lakh (+21%) |
| Premium instead of mid-range finish | +เงณ18 lakh (+19%) |
| Mat foundation on soft soil | +เงณ9 lakh (+10%) |
| District town instead of Dhaka | โเงณ5 lakh (โ6%) |
| Brick chips instead of stone in slabs and beams | โเงณ3 lakh (โ3%) |
What the estimate does not include
Land, interior design and furniture, the boundary wall and gate, AC units, light fittings, generator, lift, design fees, RAJUK approval and utility connection fees.
How to get an exact price
A firm price needs architectural drawings, structural drawings from an engineer, a soil test report, electrical and plumbing drawings and a list of your finishes. Level Seven prepares all of them. Start with our architectural design firm in Dhaka, see duplex house design in Bangladesh, get a detailed BOQ and cost estimate, check how much you can build with the RAJUK FAR calculator and get your RAJUK plan approval. When the drawings are ready, our building construction company in Dhaka can build it.
เฆฌเฆพเฆกเฆผเฆฟ เฆจเฆฟเฆฐเงเฆฎเฆพเฆฃ เฆเฆฐเฆ เฆธเฆเฆเงเฆทเงเฆชเง
เงจเงฆเงจเงฌ เฆธเฆพเฆฒเง เงฉ,เงฆเงฆเงฆ เฆฌเฆฐเงเฆเฆซเงเฆเงเฆฐ เฆฎเฆพเฆเฆพเฆฐเฆฟ เฆฎเฆพเฆจเงเฆฐ เฆกเงเฆชเงเฆฒเงเฆเงเฆธ เฆฌเฆพเฆจเฆพเฆคเง เฆจเฆฟเฆเง เฆคเฆฆเฆพเฆฐเฆเฆฟ เฆเฆฐเฆฒเง เฆชเงเฆฐเฆพเฆฏเฆผ เงฏเงฌ เฆฒเฆพเฆ เฆเฆพเฆเฆพ เฆเฆฌเฆ เฆ เฆฟเฆเฆพเฆฆเฆพเฆฐ เฆฆเฆฟเฆฏเฆผเง เฆเฆฐเฆพเฆฒเง เฆชเงเฆฐเฆพเฆฏเฆผ เงง เฆเงเฆเฆฟ เงงเงง เฆฒเฆพเฆ เฆเฆพเฆเฆพ เฆฒเฆพเฆเง, เฆ เฆฐเงเฆฅเฆพเง เฆชเงเฆฐเฆคเฆฟ เฆฌเฆฐเงเฆเฆซเงเฆเง เฆชเงเฆฐเฆพเฆฏเฆผ เงฉ,เงจเงฆเงฆ เฆฅเงเฆเง เงฉ,เงญเงฆเงฆ เฆเฆพเฆเฆพเฅค เฆฒเฆพเฆเฆฌเง เฆชเงเฆฐเฆพเฆฏเฆผ เงงเงง.เงฎ เฆเฆจ เฆฐเฆก, เงง,เงจเงญเงฆ เฆฌเฆธเงเฆคเฆพ เฆธเฆฟเฆฎเงเฆจเงเฆ เฆ เงชเงฉ,เงฆเงฆเงฆ เฆเฆเฅค เฆเฆฎเฆฟ, เฆเฆจเงเฆเงเฆฐเฆฟเฆฏเฆผเฆฐ, เฆธเงเฆฎเฆพเฆจเฆพ เฆชเงเฆฐเฆพเฆเงเฆฐ เฆ เฆกเฆฟเฆเฆพเฆเฆจ เฆซเฆฟ เฆเฆฐ เฆฌเฆพเฆเฆฐเงเฅค เฆธเฆ เฆฟเฆ เฆฆเฆพเฆฎเงเฆฐ เฆเฆจเงเฆฏ เฆเฆฐเงเฆเฆฟเฆเงเฆเฆเฆพเฆฐเฆพเฆฒ เฆ เฆธเงเฆเงเฆฐเฆพเฆเฆเฆพเฆฐเฆพเฆฒ เฆกเงเฆฐเฆฏเฆผเฆฟเฆ เฆฒเฆพเฆเฆฌเงเฅค
Use the calculator above, then bring your numbers to Level Seven Architecture & Construction in Banani, Dhaka. Rates are Level Sevenโs October 2026 survey of market prices for materials, labour and fittings; rod and cement prices change every month. Message us on WhatsApp at +8801714302055 for drawings, a detailed BOQ and a firm quote.
How much does it cost to build a duplex in Bangladesh in 2026?
A 3,000 sqft mid-range duplex costs about เงณ96 lakh if you manage the build yourself and about เงณ1.11 crore built by a contractor, roughly เงณ3,200 to เงณ3,700 per sqft. A standard finish is about เงณ2,900 to เงณ3,350 per sqft and premium about เงณ3,800 to เงณ4,400. Land, interiors and design fees are extra.
How does this calculator work?
Enter your floor sizes, rooms, finish level, foundation and location. It works out the quantity of every material and job for a typical RCC house, prices each one at current market rates, then adds site expenses, a 10% contingency and the builder's overhead and profit.
Is the house construction cost calculator free?
Yes. You can use it, save the PDF report and share it for free, without creating an account.
Is the estimate a final price or a quotation?
No. It is a planning budget from a typical design. A firm price needs architectural and structural drawings, a soil test and your finish list. Level Seven can prepare these and give you a detailed BOQ and quote.
How much rod and cement does a 3,000 sqft duplex need?
About 11.8 ton of rod (3.9 kg per sqft), 1,273 bags of cement (0.42 bags per sqft) and 43,000 bricks, plus stone chips and sand. The calculator shows these for your own floor sizes.
How much does a triplex cost to build?
A 4,400 sqft triplex, with a 1,500 sqft ground floor and two 1,400 sqft upper floors, costs about เงณ1.43 crore built by a contractor at a mid-range finish, about เงณ3,250 per sqft. The cost per sqft falls as more floors share the same foundation and roof.
Is building a house cheaper outside Dhaka?
A little. Rod and cement cost about the same everywhere, while labour, bricks and local sand are cheaper. A mid-range duplex costs about 6% less in a district town such as Bogura, Rajshahi, Rangpur or Mymensingh, and about 8% less in an upazila or village.
What does the estimate not include?
Land, interior design and furniture, the boundary wall and gate, AC units, light fittings, generator, lift, design fees, RAJUK approval and utility connection fees.
Projects
Related Projects
Blogs
From Our Blog
Guides, cost breakdowns, and design ideas for homeowners and builders in Bangladesh.