8 min read

Updated

House Construction Cost per Sqft in Bangladesh (2026)

Written and reviewed by Ishtiak Ahmed, Engineer, Level Seven

What will your house cost?
Enter your land size and floors in our free calculator and get a cost breakdown in about 2 minutes.

Building a house (single storey, duplex or triplex) in Bangladesh in 2026 costs about BDT 2,850 per square foot for a standard finish, BDT 3,150 for mid-range and BDT 3,750 for premium if you manage the build yourself, or about 15% more if a contractor builds it. An apartment building on a 5 katha plot costs about BDT 3,750 to 5,400 per saleable square foot, or BDT 3,150 to 4,800 per built square foot: it needs piles, a lift and power equipment, and its parking floor is built but not sold. See apartment building construction cost in Dhaka for the full breakdown.

The rest of this guide shows what each finish level includes, how location changes the price, and what moves the final number for a house.

Construction Cost Tiers for Houses in Bangladesh (2026)

For a house (single storey, duplex or triplex), priced item by item at October 2026 market rates. Every figure includes 3% site expenses and a 10% contingency; land, interiors and design fees are extra.

Finish

You manage the build

Built by a contractor (turnkey)

What you get

Standard

BDT 2,850 per sqft (2,400 to 3,150)

BDT 3,300 per sqft

Homogeneous floor tiles, koroi door frames, local toilet fittings, plastic paint

Mid-range

BDT 3,150 per sqft (2,650 to 3,450)

BDT 3,600 per sqft

Double charge tiles, teak door frames, RAK-class fittings, putty and emulsion paint

Premium

BDT 3,750 per sqft (3,100 to 4,400)

BDT 4,300 per sqft

Large porcelain tiles, imported fittings, heavy aluminium windows, false ceilings

Work out your own house in the free house construction cost calculator. It shows the cost, rod, cement and bricks for your floor sizes and finish.

Building in a district town such as Bogura, Rajshahi, Rangpur or Mymensingh costs about 6 percent less than in Dhaka, and about 8 percent less in an upazila or village, because labour, bricks and local sand are cheaper. Rod and cement cost about the same everywhere.

Total House Construction Cost by Size (2026)

Total cost = the floor area of all floors added together × the rate per sqft. If you manage the build yourself:

Total floor area

Standard

Mid-range

Premium

1,000 sqft

BDT 28.5 lakh

BDT 31.5 lakh

BDT 37.5 lakh

1,200 sqft

BDT 34.2 lakh

BDT 37.8 lakh

BDT 45 lakh

1,500 sqft

BDT 42.8 lakh

BDT 47.3 lakh

BDT 56.3 lakh

2,000 sqft

BDT 57 lakh

BDT 63 lakh

BDT 75 lakh

3,000 sqft

BDT 85.5 lakh

BDT 94.5 lakh

BDT 1.13 crore

If a contractor builds it (turnkey), add about 15%. For example, a 3,000 sqft mid-range duplex costs about BDT 95 lakh if you manage the build, or about BDT 1.09 crore turnkey.

Cost by number of floors

Building

Cost per sqft

Why

1 to 3 floors (single storey, duplex or triplex house)

BDT 2,850 to 3,750

Usually a shallow or mat foundation; soft soil may need piles

6 to 10 floor apartment building (5 katha)

BDT 3,150 to 4,800 per built sqft

Needs piles, a lift, a generator and a substation

A 4 or 5 storey building usually falls between the two. Whether it needs a lift and piles makes the biggest difference.

বাংলায় সংক্ষেপে: কন্সট্রাকশন কাজের রেট ২০২৬

২০২৬ সালে বাংলাদেশে বাড়ি নির্মাণে প্রতি বর্গফুট আনুমানিক খরচ: সাধারণ ফিনিশ ৳২,৮৫০, মাঝারি ৳৩,১৫০ এবং প্রিমিয়াম ৳৩,৭৫০। এই হিসাব নিজে তদারকি করে বানালে, ৩% সাইট খরচ ও ১০% কন্টিনজেন্সি সহ। ঠিকাদার দিয়ে টার্নকি করালে প্রায় ১৫% বেশি পড়ে।

ঢাকায় জেলা শহর বা গ্রামের চেয়ে প্রায় ৬ থেকে ৮% বেশি খরচ হয়। পাইল ও লিফটসহ ৫ কাঠার বহুতল অ্যাপার্টমেন্ট ভবনে বিক্রয়যোগ্য (saleable) প্রতি বর্গফুটে প্রায় ৳৩,৭৫০ থেকে ৫,৪০০, আর মোট নির্মিত (built) প্রতি বর্গফুটে প্রায় ৳৩,১৫০ থেকে ৪,৮০০। জমি, ডিজাইন ফি ও অনুমোদনের খরচ আলাদা। নিজের বাড়ির হিসাব দেখতে ফ্রি বাড়ির খরচ ক্যালকুলেটর ব্যবহার করুন।

পুরো বাংলা গাইড, মাপ ও তলা অনুযায়ী মোট খরচসহ: বাড়ি নির্মাণ খরচ ২০২৬: প্রতি বর্গফুট কত টাকা লাগে?

What about apartment buildings?

An apartment building costs more per square foot than a house of the same finish. It needs piles, a lift and power equipment, and its ground-floor parking is built but not sold. On a 5 katha plot, expect about BDT 3,150 to 4,800 per built sqft, or BDT 3,750 to 5,400 per saleable sqft, if you manage the build.

For the full apartment breakdown, a worked G+9 example and a simple explanation of saleable vs built sqft, see apartment building construction cost in Dhaka.

Important: every figure on this page covers construction only. It does not include a project management or supervision fee, which firms charge in different ways. When comparing two quotes, always ask whether supervision is included.

These are indicative ranges, not a quote. Two buildings of the exact same size can land at meaningfully different totals depending on soil condition, structural design, and material choices, which is exactly why a proper Bill of Quantities matters before construction starts.

What Actually Moves the Final Number

  • Soil condition and pile depth. Poor soil means deeper or more piles, which adds cost before a single wall goes up.

  • Material price fluctuation. Steel and cement prices change regularly in Bangladesh, and a project spanning a year or more can see real cost movement between the estimate and the final bill.

  • Finish level. This is the single biggest swing factor between the three tiers above.

  • Location. Dhaka is about 6 to 8 percent dearer than district towns and villages, mainly because of labour, bricks and local sand. Dhaka and Chattogram sit above the national average because labour costs more there.

  • Building height and design complexity. More floors, more glass, and custom architectural features all add cost beyond the basic per sqft rate.

Premium House Construction Cost per Sqft in Bangladesh 2026

A premium house in Bangladesh costs about BDT 3,750 per sqft to build in 2026 if you manage the build (BDT 3,100 to 4,400), or about BDT 4,300 if a contractor builds it. Homes with imported marble, premium sanitary ware, large glazing and smart home systems can go higher. Most of the gap between standard and premium comes from finishes and fittings, not from the structure.

What About Duplex Houses?

A duplex does not need a lift, and on firm soil it does not need piles, but only two floors share its foundation and roof. A 3,000 sqft mid-range duplex costs about BDT 95 lakh if you manage the build and about BDT 1.09 crore if a contractor builds it, roughly BDT 3,150 to 3,650 per sqft. For 4 bedroom totals and duplex-specific costs, see duplex house construction cost in Bangladesh.

How to Get an Accurate Estimate for Your Project

A per sqft rate is a useful starting point for budgeting, but it’s not a substitute for an actual estimate specific to your plot, soil condition, and design. A detailed Bill of Quantities breaks the cost down by category (foundation, structure, finishing, electrical and plumbing), so you know where every taka is going rather than working from a single averaged number. Contact Level Seven Architecture & Construction for a detailed cost estimate for your project.

Need numbers for your own building? Level Seven prepares a detailed BOQ and cost estimate from your drawings, the free house construction cost calculator gives you a first budget, and the free RAJUK FAR calculator shows how much floor area your plot allows.

Planning the interior too?
Interior design costs BDT 70 per sq ft of agreed design area, with 2D and technical layouts, room-by-room 3D views, and an itemized BOQ. Execution is quoted separately.

Interior design

Planning the interior too?

Full interior design costs BDT 70 per sq ft of agreed design area. Execution is quoted separately from the agreed BOQ.

Interior design

Planning the interior too?

Full interior design costs BDT 70 per sq ft of agreed design area. Execution is quoted separately from the agreed BOQ.

FAQs

Frequently Asked Questions

What do the standard, mid-range and premium rates include?

Standard (about BDT 2,850 per sqft) uses local tiles, plastic paint and local fittings. Mid-range (about BDT 3,150) adds double charge tiles, teak frames and branded fittings. Premium (about BDT 3,750) uses large porcelain tiles, imported fittings and false ceilings. All three assume you manage the build and include 3% site expenses and a 10% contingency.

What do the standard, mid-range and premium rates include?

Standard (about BDT 2,850 per sqft) uses local tiles, plastic paint and local fittings. Mid-range (about BDT 3,150) adds double charge tiles, teak frames and branded fittings. Premium (about BDT 3,750) uses large porcelain tiles, imported fittings and false ceilings. All three assume you manage the build and include 3% site expenses and a 10% contingency.

Does a contractor cost more than managing the build myself?

Usually about 15% more. A turnkey contractor adds overhead and profit, and in return buys the materials, hires the labour and runs the site. The rates on this page are for a self-managed build, so add about 15% to compare them with a contractor quote.

Does a contractor cost more than managing the build myself?

Usually about 15% more. A turnkey contractor adds overhead and profit, and in return buys the materials, hires the labour and runs the site. The rates on this page are for a self-managed build, so add about 15% to compare them with a contractor quote.

Does the per sqft cost include land and approval fees?

No. Per sqft construction cost figures typically cover materials and labour only. Land cost, architect fees, RAJUK approval costs, and utility connections are separate and should be budgeted in addition to the construction figure.

Does the per sqft cost include land and approval fees?

No. Per sqft construction cost figures typically cover materials and labour only. Land cost, architect fees, RAJUK approval costs, and utility connections are separate and should be budgeted in addition to the construction figure.

What is the biggest cost driver in a house?

The structure: foundation, columns, beams and slabs take the largest share, followed by finishing, meaning tiles, paint, doors, windows and fittings. Finish level is the part you control most: moving from a standard to a premium finish adds about BDT 900 per sqft.

What is the biggest cost driver in a house?

The structure: foundation, columns, beams and slabs take the largest share, followed by finishing, meaning tiles, paint, doors, windows and fittings. Finish level is the part you control most: moving from a standard to a premium finish adds about BDT 900 per sqft.

How can I get an exact cost for my specific project?

A site-specific Bill of Quantities, based on your actual soil report, floor plan, and chosen finish level, is the only way to move from an indicative range to an accurate number. Contact Level Seven Architecture & Construction for a detailed cost estimate for your project.

How can I get an exact cost for my specific project?

A site-specific Bill of Quantities, based on your actual soil report, floor plan, and chosen finish level, is the only way to move from an indicative range to an accurate number. Contact Level Seven Architecture & Construction for a detailed cost estimate for your project.

Get Started

Ready to start your project?

Get in touch today and let's discuss your project

Get Started

Ready to start your project?

Get in touch today and let's discuss your project

Get Started

Ready to start your project?

Get in touch today and let's discuss your project