Interior Design Process and Timeline in Dhaka: 6 Steps from Site Visit to Handover
Written and reviewed by Tahiya Tabassum, Architect and Founder, Level Seven
Quick answer: An interior design project in Dhaka has 6 steps: brief and site visit, measurement and 2D layout, 3D design and materials, quotation and contract, execution, and handover. Dhaka firms publish about 45 to 120 days for a full flat from contract to handover, depending on size and scope.
The 6 steps
Step | What happens | What you receive |
|---|---|---|
1. Brief and site visit | You share the rooms, budget and how you live. We visit the flat. | Notes on scope and constraints |
2. Measurement and 2D layout | We measure each room and draw layout options. | 2D floor plan with furniture |
3. 3D design and materials | We build 3D views and choose materials, colours and lighting. | 3D views, material and colour list, product sourcing list |
4. Quotation and contract | The quote shows the design fee as its own line, then execution item by item. | Itemised quote, timeline, payment stages |
5. Execution | Civil and electrical, ceiling, joinery, paint, fittings, in that order. | Site updates and supervision |
6. Handover | Final check against the drawings, fix list, cleaning, handover. | Completed interior and a handover list |
How long does each part take?
Design (steps 1 to 4) is usually the shorter part, and execution (step 5) is the longer one because joinery is made to measure. Delays most often come from late approvals, changes after the design is approved, and material lead times. Ask for dates, not “about 2 months”. See the cost guide for budgets and the designer checklist for questions to ask.
How to keep the project on time
Approve the 2D layout and the 3D design in writing before execution starts
Choose materials early, since imported items have the longest lead time
Batch your change requests instead of sending them one by one
Ask for a weekly site update with photos
Start with a free plan
Draw your flat and place furniture free in rooms by Level Seven, then share the plan with us on WhatsApp. It saves a round of measuring and shows us your layout on day one.

সংক্ষেপে
ঢাকায় ইন্টেরিয়র ডিজাইনের কাজ ছয় ধাপে হয়: ব্রিফ ও সাইট ভিজিট, মাপ ও ২ডি লেআউট, ৩ডি ডিজাইন ও ম্যাটেরিয়াল, কোটেশন ও চুক্তি, বাস্তবায়ন এবং হ্যান্ডওভার। ঢাকার ফার্মগুলো পুরো ফ্ল্যাটের জন্য সাধারণত প্রায় ৪৫ থেকে ১২০ দিন সময় উল্লেখ করে।
Related guides
প্রশ্নোত্তর (বাংলা)
ঢাকায় ফ্ল্যাটের ইন্টেরিয়র করতে কত দিন লাগে?
ঢাকার ফার্মগুলো পুরো ফ্ল্যাটের জন্য সাধারণত ৪৫ থেকে ১২০ দিন সময় উল্লেখ করে, ফ্ল্যাটের আকার ও কাজের পরিধির ওপর নির্ভর করে। ডিজাইনারের কাছ থেকে তারিখসহ সময়সূচি চেয়ে নিন।
ইন্টেরিয়র ডিজাইনের ধাপগুলো কী কী?
ব্রিফ ও সাইট ভিজিট, মাপ ও ২ডি লেআউট, ৩ডি ডিজাইন ও ম্যাটেরিয়াল, কোটেশন ও চুক্তি, বাস্তবায়ন এবং হ্যান্ডওভার।